Long Song Reservoir

![]() | ![]() |
Project location: Long Song river, Binh Thuan province
Construction time: Commencement in 2001
Project managers:Le Van Ngo - Do Van Xung - Phan Van Luong
Project tasks:Irrigating 4260 ha
Major technical parameters:
Basin area: 394 km2
Work grade: III
Surcharge water level: + 77.63 m
Normal water level: +76.95 m
Dead water level: +54.00 m
Total storage capacity: 36.88 million m3
Effective storage capacity: 32.28 million m3
Dead storage capacity: 3.6 million m3
Scale and structure of major works:
- Gravity concrete dam
+ Dam crest elevation: +79.50, length: 246m, Hmax: 44.80m
- Spillway: Ophiserov, gated, bucket type energy dissipator. Spillway dimension n(BxH) = 6x(8x6)m, Qrelief p=1%: 1795.3 m3/s. Spillway sill elevation: +70.95.
- Non-pressure intake, dimension: 1.50 x 2.20m, Qdesign = 4.20 m3/s
- Water convey system
+ R.C turnout
+ Channel: Long Song river of 4.4 km long, design discharge (Qdesign) = 2.68 m3/s
+ Tuy Tinh dam: constructed of rock masonry and rock gabion
+ Cay Ca canal constructed of R.C, 2 km long, design discharge (Qdesign) = 1.52 m3/s
- Irrigation canal system
+ Cay Ca main canal (right bank), 11.97 km long, Q=1.5 m3/s and 14 primary canals, 27.85 km long
+ Tuy Tinh main canal (left bank), 9.12 km long, design discharge Q=2.35 m3/s and 10 primary canals, 15.96 km long.
Other content
South Thach Han Reservoir(19/03/2014)
Lower Ayun Reservoir(18/03/2014)
Upper Easoup Reservoir(14/03/2014)
Tan Giang Reservoir Project(13/03/2014)
Ta Trach Reservoir(08/02/2014)
Cua Dat Reservoir(21/01/2014)
Dinh Binh Reservoir(21/01/2014)
Nuoc Trong Reservoir(17/01/2014)
Ngan Truoi Reservoir(17/01/2014)
Tan My Reservoir(07/01/2014)
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works
23/10/2013