Lower Ayun Reservoir

Project location: Headworks group is located on Ayun river in Ho Bong commune, Chu Se district, Gia Lai province (2000).
Consultancy contents:
- Geological investigation
- Topographic survey
- Preparation of feasibility study report
- Preparation of technical design + Total cost estimation
- Preparation of detailed design + Cost estimation
Project Managers: Tran Dang Am, Le Dinh Tuyet
Project tasks:
Supplying gravity irrigation water for 13 500 ha of cultivated land in Ayun district; Providing water for sugar cane factory with capacity of 2 800 T/day; Aquaculture, power generation for irrigation pumping stations in the area (capacity of 2,700 KW).
Major technical parameters:
- Work grade: II (TCXDVN 285:2002)
- Basin area: 1670 km2
- Total storage capacity: 253 x 106 m3
- Effective storage capacity: 201 x 106 m3
- Dead storage capacity: 52 x 106m3
- Dam crest length: 370.0 m
- Maximum dam height: 36.0 m
- Bspillway: 18 m
- Qspillway: 1 237.0 m3/s
- Earth excavation, earthfill: 4 488,940 m3
- Rock excavation: 285.43m3
- Concrete of various types: 55.387 m3
- Masonry works: 37.61 m3
Scale of project works:
- Earth dam: Inhomogeneous dam
- Spillway: Reinforced concrete, 3 segment gates, BxH = 6x5, electrically operated, bucket type energy dissipator.
- Intake: Reinforced concrete, located in right abutment of main dam, design discharge of 13.4 m3/s, power generation.
- Canal system: consisting of main canal, North canal, South canal and 40 canals (including primary and smaller ones).
Other content
South Thach Han Reservoir(19/03/2014)
Upper Easoup Reservoir(14/03/2014)
Tan Giang Reservoir Project(13/03/2014)
Long Song Reservoir(11/03/2014)
Ta Trach Reservoir(08/02/2014)
Cua Dat Reservoir(21/01/2014)
Dinh Binh Reservoir(21/01/2014)
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works
23/10/2013