Cua Dat Reservoir

10:45 SA @ Thứ Ba - 21 tháng 1, 2014



Normal0falsefalsefalse MicrosoftInternetExplorer4

Project location:Churiver- Thuong Xuan district, Thanh Hoaprovince

Construction time:Investigation and design time: 1999-2004

Commencement time:02/02/2004

Project managers:DinhXuan Tu, Le Van Ngo, Le Manh Hiep, Hoang Minh Dzung, Vo Van Lung

Major technical parameters:- Work grade: I

- Catchmentarea: 5938 km2

- Normal water level (NWL): 110 m

- Dead water level (DWL): 73 m

- Total storage capacity: 1,450 million m3

- Effective storage capacity: 793.70million m3

- Dead storage capacity: 268.69million m3

Scale and structure of the project works

Project tasks:

+ Mitigating flood with P=0.6%

+ Creating stable irrigation source for 86,862 ha

+ Supplying water to domestic and industrial uses with Q=7.715m3/s

+ Generating power with N = 97 MW

+ Supplementing water for downstream of Ma river in dryseason to prevent saline intrusion, improve ecological environment with Q=30.42m3/s

+ Main dam:Concreteface rockfill dam (CFRD), L=949.92m, Hmax=118.50m and 2 auxiliary dams

+ Spillway

Surface spillway

Tunnel

Sill elevation (m)

+97

+30

Dimension (m)

5 x 11 x 17

1F9

Max relief discharge P= 0.1% (m3/s)

8,200

Max relief discharge P= 0.01% (m3/s)

11,594

1230

+ Powerhouse:

- Number of unit: 2

- Installed capacity: 97 MW

- Capacity of 1 unit: 48.5 MW

- Maximum head (Hmax): 89.4m

- Minimum head (Hmin): 45.7m

- Design head (Hdesign): 69.3m