Cua Dat Reservoir

![]() | ![]() |
Normal0falsefalsefalse MicrosoftInternetExplorer4
Project location:Churiver- Thuong Xuan district, Thanh Hoaprovince
Construction time:Investigation and design time: 1999-2004
Commencement time:02/02/2004
Project managers:DinhXuan Tu, Le Van Ngo, Le Manh Hiep, Hoang Minh Dzung, Vo Van Lung
Major technical parameters:- Work grade: I
- Catchmentarea: 5938 km2
- Normal water level (NWL): 110 m
- Dead water level (DWL): 73 m
- Total storage capacity: 1,450 million m3
- Effective storage capacity: 793.70million m3
- Dead storage capacity: 268.69million m3
Scale and structure of the project works
Project tasks:
+ Mitigating flood with P=0.6%
+ Creating stable irrigation source for 86,862 ha
+ Supplying water to domestic and industrial uses with Q=7.715m3/s
+ Generating power with N = 97 MW
+ Supplementing water for downstream of Ma river in dryseason to prevent saline intrusion, improve ecological environment with Q=30.42m3/s
+ Main dam:Concreteface rockfill dam (CFRD), L=949.92m, Hmax=118.50m and 2 auxiliary dams
+ Spillway
Surface spillway | Tunnel | |
Sill elevation (m) | +97 | +30 |
Dimension (m) | 5 x 11 x 17 | 1F9 |
Max relief discharge P= 0.1% (m3/s) | 8,200 | |
Max relief discharge P= 0.01% (m3/s) | 11,594 | 1230 |
+ Powerhouse:
- Number of unit: 2
- Installed capacity: 97 MW
- Capacity of 1 unit: 48.5 MW
- Maximum head (Hmax): 89.4m
- Minimum head (Hmin): 45.7m
- Design head (Hdesign): 69.3m
Other content
South Thach Han Reservoir(19/03/2014)
Lower Ayun Reservoir(18/03/2014)
Upper Easoup Reservoir(14/03/2014)
Tan Giang Reservoir Project(13/03/2014)
Long Song Reservoir(11/03/2014)
Ta Trach Reservoir(08/02/2014)
Nuoc Trong Reservoir(17/01/2014)
Ngan Truoi Reservoir(17/01/2014)
Tan My Reservoir(07/01/2014)
Truoi Reservoir(07/01/2014)
Yen Lap Reservoir(03/01/2014)
Pa Khoang Reservoir(03/01/2014)
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works
23/10/2013