• Chu river Weir Project

    Chu river Weir Project

      03/04/2014
    Project location: Chu river, Thanh Hoa province
    Construction time: Construction: 1918-1926; Repair, upgrading: 1990-1996
    Preparation of FS report
    Project tasks: Irrigating 50 000 ha in the South of Ma river;
    Generating: Ban Thach hydropower station on main canal, installed capacity N=960 KW;
    Waterway navigation. 
  • Thach Nham Weir Project

    Thach Nham Weir Project

      02/04/2014
    Project location: Tra Khuc river - Quang Ngai province
    Construction time:
    - Commencement: 1/1/1986
    - Completion: 1995
    Project tasks:
    - Irrigating 50,000 ha (of which, creating source for 5,000 ha)
    - Supplying water for industrial and domestic uses
    - Small hydropower stations on canals 
  • Dong Mo, Ngai Son Environment Improvement Project

    Dong Mo, Ngai Son Environment Improvement Project

      01/04/2014
    Project location:
    Dong Mo river, Ngai Son stream, Ha Tay (now Hanoi)
    Construction time: 1969 - 1973
    Project tasks: Irrigating 8,600 ha of rice and 21,000 ha of other crops 
  • Day Dam - A Flood Diversion and Natural Disaster Mitigation Project

    Day Dam - A Flood Diversion and Natural Disaster Mitigation Project

      13/02/2014
    Project location: Day river in Ha Tay
    Construction time: Old dam: 1934 -1937 Rehabilitation: 1974 -1975
    Project tasks: Diverting flood on Red river to Day river in large flood years. Draining for areas on two sides of Day river in years without Red river flood diversion. 
  • Hanoi Dike - A Natural Disaster Mitigation Project

    Hanoi Dike - A Natural Disaster Mitigation Project

      12/02/2014
    Project location: Right bank of Red river in Hanoi and Ha Tay
    Construction time: From 10/10/1998 to 10/10/2000
    Project tasks:
    - Upgrading 45.4 km of dike in right bank of Red river
    - Protecting 335,000 ha of land and 4 million people.
    - Protecting Hanoi capital.