Upper Easoup Reservoir

Project location: On upstream of Easuop stream in Chu Ma Lanh commune, Easup district, Dak Lak province.
Construction time: Commencement on 12/6/2001
Project managers: Hoang Minh Dzung, Phan Nhu Hai, Nguyen Huu Ngoc
Project tasks:
- Irrigation area: 9455 ha
- Supplying water for domestic use
- Aquaculture
- Improving climate
- Generating power, N=1600 kw
Major technical parameters:
Basin area: 450 km2
Work grade: III
Surcharge water level: + 218.28 m
Normal water level: +217.58 m
Dead water level: +205.00 m
Total storage capacity: 146x106 million m3
Effective storage capacity: 135x106million m3
Dead storage capacity: 11.0 million m3
Scale and structure of project major works:
Earth dams:
+ Main dam: length: 2020m, Hmax: 26m
+ 2 auxiliary dams
Main spillway: Ophiserov, gated spillway, n(BxH) = 3(8x8)m, maximum head on spillway sill: (Hmax)=8.70m, spillway width: 24m. Sill elevation: +209.58m, discharge p=1%: 793 m3/s.
Emergency spillway is located on right bank of main spillway. The spillway is an ungated one and constructed of rock, spillway width: 80m, maximum spillway discharge=198 m3/s
Intake: Diameter d=1.8m, length: 107.4m, design discharge: 12.20 m3/s. Pressure flow.
Hydropower plant: installed capacity: N=1600kw
Other content
South Thach Han Reservoir(19/03/2014)
Lower Ayun Reservoir(18/03/2014)
Tan Giang Reservoir Project(13/03/2014)
Long Song Reservoir(11/03/2014)
Ta Trach Reservoir(08/02/2014)
Cua Dat Reservoir(21/01/2014)
Dinh Binh Reservoir(21/01/2014)
Nuoc Trong Reservoir(17/01/2014)
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works
23/10/2013