Dinh Binh Reservoir
21/01/2014Project location: Con river - Binh Dinh province
Construction time: Investigation and design time: 1995-2001 - Commencement time: 2002
Project managers: Nguyen Huu Ngoc - Nguyen Xuan Uc
Project tasks:
- Mitigating flood for downstream of Con river; - Irrigating 27,660 ha in the south of Binh Dinh province; - Aquaculture; - Generating power; - Releasing discharge of 3 m3/s to Con river for environment protectionNuoc Trong Reservoir
17/01/2014Project location: Nuoc Trong river, Quang Ngai province,the project is under construction.
Construction time: Investigation and design time: 2005-2010; Commencement:09/12/2005
Project managers: Nguyen Tri Trinh, Dinh Sy Quat, Vo Van Lung
Project tasks: - Irrigating52.600 ha of agricultural land; - Supplying water to domestic use, Dung Quat economic zone, Van Tuong city, Quang Ngai city and 7 plain districts of Quang Ngai province; - Generating power with installed capacity of 16 MW; - Mitigating downstream flooding and supplying water to aquaculture and breeding; - Developing tourism, mitigating downstream saline intrusion, improving ecological environment for the project area.Ngan Truoi Reservoir
17/01/2014Project location: Ngan Truoi river - Vu Quang district, Ha Tinh province
Construction time: 2009 - 2014
Commencement time: 14/06/2009
Project manager: Vu Phuong Minh
Major technical parameters: - Work grade: II; - Normal water level (NWL): 52.00 m; - Design maximum water level (DMWL) (P=0.5%): 54.56 m; - Check maximum water level (CMWL) (P=0.1%): 55.52 m; - Dead water level: 25 m; - Total storage capacity: 932.70 million m3; - Effective storage capacity: 704.00 million m3; - Flood control storage capacity: 157.00 million m3; - Dead storage capacity: 71.70 million m3; - Reservoir surface area at NWL: 43.10 km2; - Reservoir surface area at DMWL: 45.10 km2; - Reservoir surface area at CMWL: 46.70 km2Tan My Reservoir
07/01/2014On 31/12/2007, the Ministry of Agriculture and Rural Development issued the Decision No.4223/QĐ-BNN-XD on approving investment project of Tan My Irrigation System in Ninh Thuan province prepared by HEC. The project is a multipurpose one of class A, its main task is to supply direct irrigation water to 4,380 ha of cultivated land and supply water to Nha Trinh - Lam Cam irrigation system to irrigate 12,800 ha, aquaculture of 1,632 ha, domestic, industrial and services uses and power generation. Truoi Reservoir
07/01/2014Project location: Truoi river - Thua Thien Hue province
Construction time: Commencement in 1996
Project managers: Phan Nhu Hai, Nguyen Van Sinh, Pham Van Thuc
Project duties: - Gravity irrigation area: 8246 ha; - Mitigating flood from 2350 m3/s to 1719.9 m3/s (p=0.5%)Yen Lap Reservoir
03/01/2014Project location: Mip river, Van Nho stream - Quang Ninh province
Construction time: 1979
Project manager: In technical economic argument + technical design stage: Dao Tung (Mr)
Project duties: - Irrigating 10,064 ha; - Controlling floodPa Khoang Reservoir
03/01/2014
Latest news
Environmental impact assessment
23/10/2013Development of HEC over periods
23/10/2013Construction design consultancy of works