• Dinh Binh Reservoir

    Dinh Binh Reservoir

      21/01/2014
    Project location: Con river - Binh Dinh province
    Construction time: Investigation and design time: 1995-2001 - Commencement time: 2002
    Project managers: Nguyen Huu Ngoc - Nguyen Xuan Uc
    Project tasks:
    - Mitigating flood for downstream of Con river; - Irrigating 27,660 ha in the south of Binh Dinh province; - Aquaculture; - Generating power; - Releasing discharge of 3 m3/s to Con river for environment protection 
  • Nuoc Trong Reservoir

    Nuoc Trong Reservoir

      17/01/2014
    Project location: Nuoc Trong river, Quang Ngai province,the project is under construction.
    Construction time: Investigation and design time: 2005-2010; Commencement:09/12/2005
    Project managers: Nguyen Tri Trinh, Dinh Sy Quat, Vo Van Lung
    Project tasks: - Irrigating52.600 ha of agricultural land; - Supplying water to domestic use, Dung Quat economic zone, Van Tuong city, Quang Ngai city and 7 plain districts of Quang Ngai province; - Generating power with installed capacity of 16 MW; - Mitigating downstream flooding and supplying water to aquaculture and breeding; - Developing tourism, mitigating downstream saline intrusion, improving ecological environment for the project area. 
  • Ngan Truoi Reservoir

    Ngan Truoi Reservoir

      17/01/2014
    Project location: Ngan Truoi river - Vu Quang district, Ha Tinh province
    Construction time: 2009 - 2014
    Commencement time: 14/06/2009
    Project manager: Vu Phuong Minh
    Major technical parameters: - Work grade: II; - Normal water level (NWL): 52.00 m; - Design maximum water level (DMWL) (P=0.5%): 54.56 m; - Check maximum water level (CMWL) (P=0.1%): 55.52 m; - Dead water level: 25 m; - Total storage capacity: 932.70 million m3; - Effective storage capacity: 704.00 million m3; - Flood control storage capacity: 157.00 million m3; - Dead storage capacity: 71.70 million m3; - Reservoir surface area at NWL: 43.10 km2; - Reservoir surface area at DMWL: 45.10 km2; - Reservoir surface area at CMWL: 46.70 km2 
  • Tan My Reservoir

    Tan My Reservoir

      07/01/2014
    On 31/12/2007, the Ministry of Agriculture and Rural Development issued the Decision No.4223/QĐ-BNN-XD on approving investment project of Tan My Irrigation System in Ninh Thuan province prepared by HEC. The project is a multipurpose one of class A, its main task is to supply direct irrigation water to 4,380 ha of cultivated land and supply water to Nha Trinh - Lam Cam irrigation system to irrigate 12,800 ha, aquaculture of 1,632 ha, domestic, industrial and services uses and power generation. 
  • Truoi Reservoir

    Truoi Reservoir

      07/01/2014
    Project location: Truoi river - Thua Thien Hue province
    Construction time: Commencement in 1996
    Project managers: Phan Nhu Hai, Nguyen Van Sinh, Pham Van Thuc
    Project duties: - Gravity irrigation area: 8246 ha; - Mitigating flood from 2350 m3/s to 1719.9 m3/s (p=0.5%) 
  • Yen Lap Reservoir

    Yen Lap Reservoir

      03/01/2014
    Project location: Mip river, Van Nho stream - Quang Ninh province
    Construction time: 1979
    Project manager: In technical economic argument + technical design stage: Dao Tung (Mr)
    Project duties: - Irrigating 10,064 ha; - Controlling flood 
  • Pa Khoang Reservoir

    Pa Khoang Reservoir

      03/01/2014