Dinh Binh Hydropower Project

03:19 CH @ Thứ Ba - 18 tháng 2, 2014

Project location: on the left side of Kon river, at spillway span No.8 in Vinh Hao commune, Vinh Thanh district, Binh Dinh province.

Project manager: Nguyen Xuan Uc

Project tasks:

- Generating power with capacity of 6600KW

- Controlling early, late floods

- Mitigating flood, supplying water for industrial and domestic uses

- Supplying irrigation water to agricultural production, rural industries and domestic uses

Major technical parameters:

Work grade: III

Technical parameters of the powerhouse:

+ Minimum discharge through 1 unit: Qmin=9.78 m3/s

+Maximum discharge through 1 unit: Qmax=12.5 m3/s

+ Design head: Hdesign = 30.74m

+ Installed capacity: N = 6.6MW

+ Number of unit: 2 units

+ Turbine type: Francis turbine

+ Vertical axis 3-phase synchronous generator

+ Annual average power output: 32.22 million KW